Installation Overview At a prominent confectionery site in York, Newsome has commissioned a efficient 400 kW chiller, marking the noteworthy realisation of the project. Designed to strengthen ESG targets, the installation boosts system dependability while lowering overall energy usage and CO₂ emissions. https://growthbookmarks.com/story20665624/advanced-400-kw-chiller-installation-secures-fifty-thousand-pounds-annual-cost-reduction-on-energy-and-200-tonnes-co%E2%82%82-saving