The plans also include things like a big battery at the positioning, to ensure extra power could be stored to the evening, plus a 220 kV transmission line that may join the challenge to the North Star sub-station, close to exactly where a fresh 100 MW solar challenge is also https://totalsolar.com.au/how-does-a-solar-panel-work-unveiling-the-power-of-the-sun/