Engaged on TRS sheds associated with overhauling and assembly stage routine maintenance of 25KV AC electric powered locos in electrical loco sheds is the worker’s responsibility. For the goal of calculation of percentage of matriculation, marks acquired with the candidates in all topics will likely be reckoned rather than on https://railway-recruitment64062.blogofchange.com/33768710/railway-recruitment-kolkata-rrb-group-d-32000-vacancy-pdf